With a wide array of specialty pieces of equipment, knowledgeable staff, and the ability to process large amounts of scrap steel, Klenck Company was able to complete the demolition of the former Wabash River Bridge in Mt. Carmel, Illinois with zero impact to the new bridge structure.
Post time: Jun-26-2017